Local suppliers and in-house resources unable to drive offshore, realizing modest cost reduction
Warning: Use of undefined constant string - assumed 'string' (this will throw an Error in a future version of PHP) in /var/www/stage/quest-global-v2/wp-content/plugins/rx-dynamic-sections/sections.php on line 6721
Features
Increased production throughput Enabled 3X build rate
Reduced Cost of Non-Quality $10M annual savings
Process improvement 🡪 Faster, Better, Cheaper Time for disposition - 1/5th
Capability 32 delegated design signatories
Benefits
Increased production throughput enabled 3X build rate
Reduced cost of Non-Quality - $10M annual savings
Process improvement - Faster, Better, Cheaper Time for disposition - 1/5th
Capability - 32 delegated design signatories
200,000+ concessions delivered with Non conformance Management