Warning: json_decode() expects parameter 1 to be string, array given in /var/www/stage/quest-global-v2/wp-content/plugins/rx-dynamic-sections/sections.php on line 7088
Automated Train Supervision Development for Efficient monitoring, Tracking and controlling of trains on guideway and Traffic management
The ATS Software deployed in various geographies, presents the operator with
Signaling Plan, Control Table and Track Schematic
Performance reports
Development Tools and Integration Simulators
Scope
Design and development of ATS Software in accordance to CENELEC EN50128 SIL 2
Solution
Software design and development
Documentation of design Specification
Component testing, Database Testing
System and Sub-system level testing in Lab
Agile methodologies and Scrum Framework
Continuous integration and continuous development(CICD) with regression testing
Warning: Use of undefined constant string - assumed 'string' (this will throw an Error in a future version of PHP) in /var/www/stage/quest-global-v2/wp-content/plugins/rx-dynamic-sections/sections.php on line 6721
Features
Features
Provides a human-machine interface
Train Regulation on the line
Maintenance information collection (on-board, track side & rolling stock alarms)
Train identification from train PTI (Positive Train Identification) or TAG
Junction and Turnback management, TSR, ATR, ARS and external interface Management
Benefits
Monitoring, Tracking and controlling of trains on guideway